Decommissioning cost estimation for a multiple reactor site with interdependent plants: case study using a new management tool and top-down approach
DOI:
https://doi.org/10.15392/bjrs.v8i3A.1404Palavras-chave:
top-down, multiple reactor, benchmark, cost estimation, budgetResumo
In the end of operational life, a nuclear power plant should be decommissioned to release its site for a new purpose. The decommissioning cost estimation is part of the decommissioning plan, which also include the decommissioning strategy definition. The cost estimation is performed by management tools, most of them according the bottom-up approach. However, this approach usually requires large quantities of data and detailed knowledge of the site conditions and the project phases, which are often unknown in the project beginning, requiring the adoption of several assumptions. Otherwise, the top-down approach requires less data or assumptions, and the project details is known as it became mature. Due to this, the top-down approach is a better approach for cost estimation during planning phase than the bottom-up. Despite it, most part of management tools found in literature to cost estimation are structured according the bottom-up approach. To suppress this lack, recently a new management tool was developed according the top-down approach, being able to estimate the decommissioning cost of nuclear power plants for budget/bid purposes. This work aims to present the cost estimation to decommissioning a multiple reactor power site with similar characteristics of the Brazilian ones, which would be used as benchmark. The results demonstrated that the interdependencies among the plants are important and affects significantly the cost to decommissioning each plant. This work is part of a research that is under course in which several strategies alternatives would be evaluated.
Downloads
Referências
MONTEIRO, D.B.; MOREIRA, J.M.L.; MAIORINO, J.R.; A new management tool and mathematical model for decommissioning cost estimation of multiple reactors site. Progress in Nuclear Energy, v.114, p.61-83, 2019.
MONTEIRO, D.B.; Decommissioning of Brazilian nuclear centrals: proposal of a management tool for decommissioning costing. PhD Thesis. UFABC,
Santo André – SP, 2017.
MONTEIRO, D.B.; MOREIRA, João M.L.; MAIORINO, José R.; Decommissioning strategy and schedule for a multiple reactor nuclear power plant site. In: Proceedings of INAC 2015, ABEN, XIX Encontro Nacional de Física de Reatores - ENFIR. São Paulo, Brasil, Oct. 4-9, 2015.
MONTEIRO, D.B.; MOREIRA, João M.L.; MAIORINO, José R.; Brazilian nuclear power plants decommissioning plan based on multiple reactor decommissioning approach. In: Proceedings of INAC 2015, ABEN, XIX Encontro Nacional de Física de Reatores - ENFIR. São Paulo, Brasil, Oct. 4-9, 2015.
MONTEIRO, D.B.; MOREIRA, J.M.L.; MAIORINO, J.R.; Metodologia e equações para estimar o custo de descomissionamento de plantas nucleares brasileiras; In: Proccedings of IX Congresso Brasileiro de Planejamento Energético, Florianópolis, Brazil, Ago. 25-27, 2014.
OECD/NEA – Organization for Economic Cooperation and Development/ Nuclear Energy Agency. International Structure for Decommissioning Costing of Nuclear Installations, OECD/NEA, 2012.
PMI – Project Management Institute. PMBook Guide Chapter 1: Introduction. 3rd edition, Norma ANSI/PMI 99-001-2004, ISBN: 1-930699-74-3 (Brochure-Português-Brasil), 3 ed., p. 3-18, PMI, Pennsylvania, EUA, (2004).
FRAJNDLICH, R.; Considerations about the decommissioning of the IEA-R1 research reactor and the future of its facilities after shutdown. PhD Thesis. Instituto de Pesquisas Energéticas e Nucleares, IPEN, Autarquia associada à Universidade de São Paulo, USP, São Paulo, 2014.
US-NRC – US Nuclear Regulatory Commission. Changes in Decommissioning Waste Disposal
Costs at Low-Level Waste Burial Facilities. NRC U.S.NRC, NUREG/CR-1307, Rev.15, 2012.
ZACHAR, M.; DANIŠKA, V.; NEČAS, V.; Improved analytical methodology for calculation assessment of material parameters in nuclear installation decommissioning process. Progress in Nuclear Energy, v.53, p.463-470, 2011.
US-NRC – US Nuclear Regulatory Commission. Estimating Pressurized Water Reactor Decommissioning Costs, A User’s Manual for the PWR Cost Estimating Computer Program (CECP) Software, Draft Report for Comment. Division of Regulatory Applications, U.S.NRC, NUREG/CR-6054 PNL-8497, NRC, 1993.
PINHO, B.E.; An initial plan proposal for the transition period after pemanent shutdown of Angra 1 nuclear power plant until the safe storage. Master Thesis. Rio de Janeiro – RJ. COPPE – UFRJ, 2018.
Downloads
Publicado
Edição
Seção
Licença
Direitos autorais (c) 2021 Brazilian Journal of Radiation Sciences

Este trabalho está licenciado sob uma licença Creative Commons Attribution 4.0 International License.
Declaro que o presente artigo é original, não tendo sido submetido à publicação em qualquer outro periódico nacional ou internacional, quer seja em parte ou em sua totalidade. Declaro, ainda, que uma vez publicado na revista Brazilian Journal of Radiation Sciences, editada pela Sociedade Brasileira de Proteção Radiológica, o mesmo jamais será submetido por mim ou por qualquer um dos demais co-autores a qualquer outro periódico. Através deste instrumento, em meu nome e em nome dos demais co-autores, porventura existentes, cedo os direitos autorais do referido artigo à Sociedade Brasileira de Proteção Radiológica, que está autorizada a publicá-lo em meio impresso, digital, ou outro existente, sem retribuição financeira para os autores.
Licença
Os artigos do BJRS são licenciados sob uma Creative Commons Atribuição 4.0 Licença Internacional, que permite o uso, compartilhamento, adaptação, distribuição e reprodução em qualquer meio ou formato, desde que você dê o devido crédito ao (s) autor (es) original (is) e à fonte, forneça um link para a licença Creative Commons, e indique se mudanças foram feitas. As imagens ou outro material de terceiros neste artigo estão incluídos na licença Creative Commons do artigo, a menos que indicado de outra forma em uma linha de crédito para o material. Se o material não estiver incluído no licença Creative Commons do artigo e seu uso pretendido não é permitido por regulamentação legal ou excede o uso permitido, você precisará obter permissão diretamente do detentor dos direitos autorais. Para visualizar uma cópia desta licença, visite http://creativecommons.org/licenses/by/4.0/