Decommissioning cost estimation considering the activities facilitation due remote-controlled equipment
DOI:
https://doi.org/10.15392/2319-0612.2022.1836Palabras clave:
Remote-controlled, Decommissioning, Cost reduction, Facilitation, RisksResumen
The decommissioning is a complex, costly and hazard process which should be performed in the end of the operational life of a nuclear power plant aiming to reduce the risks offered due to its operation to the environment and public at large. Several kinds of activities are required, with the decontamination and dismantling comprising some of the most important. Several tasks of these activities should be performed in places submitted to high radiation activity, increasing the exposure risks to the labors and costs since more labors and additional time are required aiming to reduce the risks. Despite of it, several of the equipment often used during the plant’s operation have some automation degree, which allow to control it remotely. This technology could be used during the decommissioning, as it is done nowadays in several projects around the world. In the present work, the influence of the adoption of this technology to perform decontamination and dismantling activities would be evaluated regarding the cost reduction. A hypothetical plant would be considered as case of study, to which some idealized assumptions was made. The results demonstrates that to this limit case the cost of the project could be reduced by more than 50%, indicating the potential which the adoption of this technology could have in the project.
Descargas
Referencias
“Carbon Dioxide Emissions from Electricity”. World Nuclear Association. Available at: https://www.world-nuclear.org/information-library/energy-and-the-environment/carbon-dioxide-emissions-from-electricity.aspx. Last accessed: 30 Dec. 2021.
OECD-NEA. “The Role of Nuclear Energy in a Low-Carbon Energy Future”, 2012.
“Decommissioning Nuclear Facilities”. World Nuclear Association. Available at: https://world-nuclear.org/information-library/nuclear-fuel-cycle/nuclear-wastes/decommissioning-nuclear-facilities.aspx. Last accessed: 30 Dec. 2021.
“Decommissioning nuclear reactors is a long-term and costly process”. EIA. Available at: https://www.eia.gov/todayinenergy/detail.php?id=33792. Last accessed: 30 Dec. 2021.
Monteiro, D.B.; Moreira, J.M.L.; Maiorino, J.R., “A new management tool and mathematical model for decommissioning cost estimation of multiple reactors site”. Progress in Nuclear Energy, vol. 114, pp. 61-83, 2019.
Monteiro, D.B.; Moreira, J.M.L.; Maiorino, J.R., “A method for decommissioning strategy proposal and a cost estimation considering a multiple reactor site with interdependent plants”. Progress in Nuclear Energy, vol. 127, 103440, 2020.
Monteiro, D.B., “Decommissioning of the Nuclear Power Plants in Brazil: Proposal of a management tool for the decommissioning cost estimation”. PhD Thesis. UFABC, 2017.
Descargas
Publicado
Número
Sección
Licencia
Derechos de autor 2022 Brazilian Journal of Radiation Sciences (BJRS)

Esta obra está bajo una licencia internacional Creative Commons Atribución 4.0.
Licencia: los artículos de BJRS tienen una licencia internacional Creative Commons Attribution 4.0, que permite el uso, el intercambio, la adaptación, la distribución y la reproducción en cualquier medio o formato, siempre que se otorgue el crédito correspondiente al autor o autores originales y a la fuente, proporcione un enlace a la licencia Creative Commons e indique si se realizaron cambios. Las imágenes u otros materiales de terceros en el artículo están incluidos en la licencia Creative Commons del artículo, a menos que se indique lo contrario en una línea de crédito al material. Si el material no está incluido en la licencia Creative Commons del artículo y su uso previsto no está permitido por la regulación legal o excede el uso permitido, el autor deberá obtener el permiso directamente del titular de los derechos de autor. Para ver una copia de esta licencia, visite http://creativecommons.org/licenses/by/4.0/