Comparison of Estimates of Costs involved between two Decommissioning Strategies for PWR type Nuclear Power Plants

Authors

  • M. V. A. de Oliveira Universidade Federal do Rio de Janeiro
  • G. L. de Stefanni Universidade Federal do Rio de Janeiro https://orcid.org/0000-0001-5968-3510

DOI:

https://doi.org/10.15392/2319-0612.2022.1962

Keywords:

decommissioning, nuclear power plant, costs estimation, strategy decommissioning

Abstract

This work compares the project costs of two possible decommissioning strategies for a hypothetical nuclear site with similar characteristics to the CNAAA reactors. The cost of the process is sensitive to the type of strategy adopted, as the type of strategy involves the duration of the process. Defining project strategy/duration and estimating cost are part of a coupled problem. Thus, decommissioning cost is a relevant step and needs to be rigorously defined before starting the decommissioning process, as demobilizing teams/equipment, and remobilizing entail extra costs. Cost estimates follow the Av-Descom model. Tool easily implemented by a spreadsheet-like code. Among the stages of the two strategies presented, the one with the greatest impact on the cost of the project is the stage referring to the transition period comprised by the decontamination tasks of the systems, equipment, and structure of the deactivated NPP. This step exposes workers to radiation doses and to the greatest occupational hazards. It was observed that the cost variation from one strategy to another is above 50% of the total cost of the project. It was concluded that defining the best decommissioning strategy is complex and important to be defined from the beginning of the decommissioning process. It was inferred that the strategy that best fits the Brazilian reality is the delayed decommissioning.

Downloads

Download data is not yet available.

References

MOREIRA, L. M. J; BERECHE, P. R.; MAIORINO, R. J. Questões sobre Energia. Rio de Janeiro. Ed. Interciência. 2017.

USNRC. Regulatory Guide 1.202. Standard Format and Contented Decommissioning Cost Estimates for Nuclear Power Reactors. USNRC, February 2005.

CNEN. Resolução CNEN Nº 133. Descomissionamento de Usinas Nucleoelétricas. Ministério da Ciência e da Tecnologia, Comissão Nacional de Energia Nuclear, 2012.

WNA. Decommissioning nuclear facilities. Word Nuclear Association. Available in: http://www.word-nuclear.org./info/inf19.html. Access July 20, 2021.

MONTEIRO, D.B.; MOREIRA, João M.L.; MAIORINO, José R.; Brazilian nuclear power plants decommissioning plan based on multiple reactors decommissioning approach. In: Proceedings of INAC 2015, ABEN, XIX Encontro Nacional de Física de Reatores - ENFIR. São Paulo, Brasil, Oct. 4-9, 2015.

MONTEIRO, D.B.; MOREIRA, J.M.L.; MAIORINO, J.R.; A new management tool and mathematical model for decommissioning cost estimation of multiple reactors site. Progress in Nuclear Energy, v.114, p.61-83, 2019. DOI: https://doi.org/10.1016/j.pnucene.2019.03.004

MONTEIRO, D.B.; Decommissioning of Brazilian nuclear centrals: proposal of a management tool for decommissioning costing. PhD Thesis. UFABC, Santo André – SP, 2017.

MONTEIRO, Deiglys Borges; MOREIRA, João Manoel Lousada; MAIORINO, José Rubens. Decommissioning cost estimation for a multiple reactor site with interdependent plants: case study using a new management tool and top-down approach. Brazilian Journal of Radiation Sciences, v. 8, n. 3A, 2020. DOI: https://doi.org/10.15392/bjrs.v8i3A.1404

IAEA, Classification of Radioactive Waste, General Safety Guide, N° GSG-1, IAEA (2009).

KONZEK, G. J., et al. Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure, Volume 1, Final report. No. NUREG/CR--5884-VOL. 1. Nuclear Regulatory Commission, 1995. DOI: https://doi.org/10.2172/146799

CNEN. Resolução CNEN Nº 3.01. Diretrizes Básicas de Proteção Radiológica. Ministério da Ciência e da Tecnologia, Comissão Nacional de Energia Nuclear, 2014.

JEONG, K et al. Structure and elements for the decommissioning cost estimations of nuclear research reactors. Annals of Nuclear Energy, v.34, p. 326-332, 2007. DOI: https://doi.org/10.1016/j.anucene.2007.01.005