Applying Human Factors Engineering Program to the Modernization Project of NPP Control Room in accordance with U.S.NRC and KTA Regulations
DOI:
https://doi.org/10.15392/bjrs.v7i2B.643Keywords:
Control Room, Human Factors Engineering Program, Regulations and Licensing.Abstract
Application of Human Factors Engineering (HFE) in the design and implementation of such a project is essential to ensure that the new man-machine interface outcoming from the modernization does not have any negative impacts on human performance and plant safety.
This paper analyzes the applicability of the Human Factors Engineering Program in the licensing and certification of Konvoi Nucleoelectric Power Plant Control Room modernization Project using digital instrumentation and control in accordance with U.S.NRC and KRA regulations.
The results of the analyses show that although regulatory bodies adopt different methodology in the process of licensing the modernization of control rooms, the engineering aspects are being developed based on the principles of engineering.
- Views: 132
- PDF Downloads: 193
Downloads
References
EPRI - Electric Power Research Institute. Human Factors Guidance for Control Room and Digital Human-System Interface Design and Modifications – Guidelines for Planning, Specification, Design, Licensing, Implementation, Training, Operation and Maintenance. Report 1008122, Palo Alto, CA, 2004.
GALLETI S. G. Human Factors Issues in Digital System Design and Implementation. In: INTERNATIONAL TOPICAL MEETING ON NUCLEAR PLANT INSTRUMEN-TATION, CONTROL AND HUMAN-MACHINE INTERFACE TECHNOLOGIES. La Grange Park, IL, 1996, American Nuclear Society.
HUGO J. Linking Humans and Systems in Nuclear Power. In: 8th INTERNATIONAL TOPICAL MEETING ON NUCLEAR PLANT INSTRUMENTATION, CONTROL AND HUMAN-MACHINE INTERFACE TECHNOLOGIES. San Diego, CA, 2012, American Nuclear Society.
IAEA - International Atomic Energy Agency. Integration of Analog and Digital Instrumentation and Control Systems in Hybrid Control Rooms. NP-T-3.10, Vienna, 2010.
IAEA - International Atomic Energy Agency, Risk Management of Knowledge Loss in Nuclear Industry Organizations, Vienna, 2006.
IAEA - International Atomic Energy Agency. Managing Modernization of Nuclear Power Plant Instrumentation and Control Systems. TECDOC-1389, Vienna, 2004.
IEC - International Electrotechnical Commission. Nuclear Power Plants – Control Room – Design. IEC 60964 Rev. 2009, Geneva, 2009.
IEC - International Electrotechnical Commission. Nuclear Power Plants – Main Control Room Verification and Validation of Design. IEC 61771 Rev. 1995, Geneva, 1995.
IEC - International Electrotechnical Commission. Nuclear Power Plants – Design of Control Room – Functional Analysis and Assignment. IEC 61839 Rev. 2000, Geneva, 2000.
KOSKINEN H.; LAARNI J.; SALO L.; SAVIOJA, P. Developing a Human Factors Engineering Process for Control Room Upgrades. INTERNATIONAL CONFERENCE ON HUMAN FACTORS IN ENERGY: OIL, GAS, NUCLEAR AND ELECTRIC POWER INDUSTRIES, Walt Disney World, FL, 2016, AHFE International.
LIU P., LI ZZ. Comparison between conventional and digital nuclear power plant main con-trol rooms: A task complexity perspective, part I: Overall results and analysis. International Journal of Industrial Ergonomics, Volume 51, pp. 2-9, 2016.
U.S.NRC - Nuclear Regulatory Commission. Human Factors Engineering Program Review Model. NUREG-0711 Rev.3, Washington, 2012.
KTA - Nuclear Safety Standards Commission. Control Room, Remote Shutdown Station and Local Control Stations in Nuclear Power Plants. KTA 3904, Salzgitter, 2007.
O’HARA J.; HIGGINS, J.; FLEGER, S.; BARNES, V. Human-system Interfaces for Automatic Systems. In: 7th AMERICAN NUCLEAR SOCIETY INTERNATIONAL TOPICAL MEETING ON NUCLEAR PLANT INSTRUMENTATION, CONTROL AND HUMAN-MACHINE INTERFACE TECHNOLOGIES. Las Vegas, NV, 2010.
O’HARA J.; STUBLER, B.; KRAMER, J. Human Factors Considerations in Control Room Modernization: Trends and Personnel Performance Issues. 6th IEEE CONFERENCE ON HUMAN FACTORS AND POWER PLANTS: HUMAN FACTORS AND POWER GENERATION - A GLOBAL PERSPECTIVE, Orlando, FL, 1997.
O’HARA J.; STUBLER, W. F.; HIGGINS, J. C. Human Factors Evaluation of Hybrid Human-System Interfaces in Nuclear Power Plants, Handbook of Human Factors Testing and Evaluation, 2nd Edition, Lawrence Erlbaum Associates, Mahwash, NJ, 2002.
SCHNÜRER G.; WACH, D.; SEIDEL, F.; WEIL, L. Upgrades of Digital I&C in German Nuclear Power Plants Regulatory Aspects and Qualification Requirements. IAEA SPECIALISTS MEETING ON MODERNIZATION OF INSTRUMENTATION AND CONTROL SYSTEMS IN NUCLEAR POWER PLANTS, Munich, 1995.
Published
How to Cite
Issue
Section
License
Copyright (c) 2019 Brazilian Journal of Radiation Sciences
This work is licensed under a Creative Commons Attribution 4.0 International License.
Licensing: The BJRS articles are licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license, and indicate if changes were made. The images or other third party material in this article are included in the article’s Creative Commons license, unless indicated otherwise in a credit line to the material. If material is not included in the article’s Creative Commons license and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this license, visit http://creativecommons.org/licenses/by/4.0/